| Sign In | Join Free | My brakesband.com |
|
Place of Origin : Longkou ,Shandong Province, China
Brand Name : FC
Certification : CE/ISO9001
Model Number : FC-ZMW-2, FC-ZMW-3,FC-ZMW4,FC-ZMG3-24,FC-ZMG4-32,FC-ZMG6-48
Output(pcs/hr) : 500-600 700-900 1000-1200 1800-2500 2800-3500 3800-5000
MOQ : 1set or mail to lewis@goodeggtraymachine-com.ecer.com
Packaging Details : Export Standard Package
Delivery Time : Within 40-60 days
Payment Terms : T/T
Supply Ability : 100set/year
Raw material:Waste paper
| Machine | hydraulic pulper | high-freqency vibration sieve frame | pulp pump | strengthening of priming pump | control cabinet for pulp system | agitator |
| specification | 1.0M3 | 0.9M2 | standard component(made in china) | standard component (made in china) | standard | standard component (made in china) |
| motor | 11KW | 3.0KW | 3*3KW | 3KW |
| 3*1.5KW |
| machine | tiltering forming machine | molds | vacuum pump | screw air compressor | vacuum buffer tank | air compressor storage tank | white water pump | high-pressure water pump | refiner machine |
| specification | size:1300*520mm forming efficiency:5-7cycles/min
| forming mould size:295*295mm materials:plastic quantity:6pcs |
|
| 0.6M3 | 0.3 M3 standard component(made in china) | standard component(made in china) | standard component(made in china) | standard component(made in china) |
| motor |
|
| 18.5KW | 15KW |
|
| 2.2KW | 2.2KW | |
| machine | conveyor | blower | induced fan | burner | bellows | tracked board | fore dynamics | postern dynamics | chain | heating box |
| unit/quantity | 20M | 5 | 1 | 5 | 24 | 380 | 1 | 1 | 95M | 60 |
| motor |
| 5*4KW | 2.2KW |
|
|
|
| 3KW |
|
|
| 1.consumption( /HOUR): water:120-150kg waste paper :60-75kg electricity:80-86kw 0# diesel oil:15-20kg natural gas:15-18kg LPG:10-15kg |
| 2.The above quotation doesn’t include the packing cost of large equipment. |
| 3.The way of payment:30% of the total amount of money signed in the contact must be paid as the contact |
| becomes effective, 65% of the total amount of money must be completed before delivery of equipment. |
| The rest 5% must be paid within 7 days after finishing all the installation. |
| 4. Delivery time: 40 working days after received deposit |
| 5.The design of technological process and plant arrangement will be provided according to the plant situation of the customer. |
| 6. workforce: 5-6people / working group |
| 7.we are in charge of installing,degugging and training, the total time is about 1 months |
| 8.buyer side should be responsible for two way flight tickets, local hotel and food charge, as well as $70 per day |
| for each technican as salary/subsidy |
| 9.Container: 1 40' HQ and 1 20'GP |
| 10.guarantee: repair and maintenance one year for free. |
| Item | Video Link |
|---|---|
| 1:Our machine in Egypt: | |
| 2:Roller Type Egg Tray Machine: | |
| 3:Reciprocating Egg Tray Machine: | |
| 4:Pulp Making system: | |
| 5:Drying system: | |
| 6:Forming system: | |
| 7:Packing system: |









| Main Technical Parameters of Pulp Moulding Egg Tray Machine: | |||
| Product Name: | Reciprocating Type egg tray machine | ||
| Model: | FC-ZMW-2 | FC-ZMW-3 | FC-ZMW-4 |
| Output: | 400-600 pcs/hr | 600-800 pcs/hr | 800-1000 pcs/hr |
| Molding Mould/pcs: | 2 | 3 | 4 |
| Transfer Mould/pcs: | 2 | 3 |
|
| Main Technical Parameters of Pulp Moulding Egg Tray Machine: | |||
| Product name: | Roller type Pulp Moulding Machine | ||
| Model: | FC-ZMG3-24 | FC-ZMG4-32 | FC-ZMG6-48 |
| Output: | 1500-2000 pcs/h | 2500-3000 pcs/h | 3500-4000 pcs/h |
| Molding Mould/pcs: | 24 | 32 | 48 |
| Transfer Mould/pcs: | 3 | 4 | 6 |
| Contact: | Mr Lewis |
| Email: | |
| Skype: | lewis15863824208 |
| Gtalk: | |
| Yahoo Messenger: | |
| Mobile: | +86-15863824208 |
| Website: | |
| We are the professional manufacturer of Pulp moulding Machine and EPE Foam Extruder Line etc in Longkou ,Shandong Province, China. | |
|
|
Dry Type Pulp Moulding Machine Images |